PRODUCTION
Operation is supported by a numerous of facilities such as jetty, explosive safety stock, stockpile and employee's mess.
The jetty can allow the one barge with a maximum capacity of 10,000 DWT.
Stockpile area for crusher products is 6,876m² that it can stock 40,000 WMT.
A maximum boulder stockpile capacity can allow to stock 25.000 ton.
Gita Perkasa Mineralindo operates two main pits (North and Central Pits) with a total production of 50,000 per month Operating Units to support mine operations:
- 3 units PC 300
- 3 units PC 200
- 1 unit breaker PC 200
- 1 unit wheel loader
- 7 units dump truck
Ash product 0-1 (size 0-1 cm)
Product 1-2 (size 1-2 cm)


Product 2-4 (size 2-4 cm)
Product 4-9 (size 4-9 cm)